CONTRACT AWARDED: Provide two additional Emulsion Cracking Systems (ECS). Customer has already purchased several other ECS tanks from Westlake Environmental.

Our Solution:   Provide two Emulsion Cracking Systems (ECS) to remove emulsified oils from a waste stream.   Operators state that the systems are easy to operate and maintain.  Each system includes the following:

  1. Tank manufactured in 304 stainless-steel with fiberglass walkway grating
  2. Mixers
  3. Chemical pumps
  4. pH probe assemblies to automatically control the chemical pumps
  5. Integrated walkway
  6. On site project management and programming

CONTRACT AWARDED: Provide a Chemical Addition System (CAS) with an Inclined Plate Clarifier (IPC) on a common skid.

Our Solution:   Provide a CAS and IPC system to remove metals from a waste stream.  System includes:

  1. A-36 carbon steel tanks with coal tar epoxy interior/polyurethane exterior coatings
  2. Sludge auger in IPC to convey sludge to a sludge outlet port
  3. Sludge pump to convey sludge from IPC to a sludge holding tank
  4. Effluent pump to convey IPC processed water to sewer
  5. Expanded effluent chamber in IPC
  6. OSHA platform to view inside of both tanks
  7. NEMA 4X 304 stainless steel control panel
  8. Entire system mounted to a common skid for quick installation

CONTRACT AWARDED: Provide a custom designed sludge holding tank

Our Solution:   Provide a custom designed sludge holding tank.  Tank includes:

  1. A-36 carbon steel tank with coal tar epoxy interior and polyurethane exterior coatings
  2. Ladder assembly for access to the top of the tank
  3. Safety handrails around the top of the tank
  4. Several flanges along the side and in the top of tank
  5. Inspection hatch located in top of tank for quick inspection